– Mount Crosby Pipeline Painting Project –

Brisbane Queensland

It is commendable that the maintenance of this vital infrastructure is underway,
however the corrosion INSIDE these pipes and the over seven thousand
kilometres of water mains in South East Queensland can be reduced
as soon as water fluoridation is stopped.

 DECOMMISSIONING FLUORIDATION PLANTS – Qld.

See ⇒ FLUORIDATION AND CORROSION  

eptec-logo

      See also ⇒ EPTEC


mt-crosby-pipe-66-1024x515

pipe-1

mt-crosby-pipe-4

mt-crosby-pipe-3

mt-crosby-pipe-5-1024x509
mt-pipe-2

     KEEP UP THE GOOD WORK !

Fluoridation Queensland Logo

 

leaf-devider